Submission History: 2011/116/PCD - LR11: Erect wind turbine on 15m tower with 8.6m diameter blades with trenched cable connection: Burra Public Hall, Hamnavoe, Burra Help Icon

This is the history for the submission "2011/116/PCD - LR11: Erect wind turbine on 15m tower with 8.6m diameter blades with trenched cable connection: Burra Public Hall, Hamnavoe, Burra".

It shows every meeting that the submission went before and links to the agenda for those meetings.


Committee Meeting View Agenda
Planning Committee 15/11/2011 Click here