Submission History: 2018/335/ECUCON - To vary the consent by increasing the maximum tip height of the turbines from 145 metres (m) to a maximum of 155 m and increasing the maximum rotor diameter of the turbines by 10 m to a maximum of 120 m. The installed capacity of the proposed generating stated would be greater than 50 MW. (Viking Wind Farm).
This is the history for the submission "2018/335/ECUCON - To vary the consent by increasing the maximum tip height of the turbines from 145 metres (m) to a maximum of 155 m and increasing the maximum rotor diameter of the turbines by 10 m to a maximum of 120 m. The installed capacity of the proposed generating stated would be greater than 50 MW. (Viking Wind Farm). ".
It shows every meeting that the submission went before and links to the agenda for those meetings.
Committee | Meeting | View Agenda |
Planning Committee | 13/02/2019 | Click here |