Submission Documents: 2013/295/PPF: To erect and install 1 no. 5kw wind turbine on a 15m high mast, adjacent to Mangaster, Sullom, by Mr B Manson, Mangaster, Sullom, Shetland. Help Icon

This is the list of documents available for the submission 2013/295/PPF: To erect and install 1 no. 5kw wind turbine on a 15m high mast, adjacent to Mangaster, Sullom, by Mr B Manson, Mangaster, Sullom, Shetland. .

Click on the links to view the individual documents in PDF format.

Name Type of Document Access View Document
Item Minute - 10 December 2013 Minute Public Open Document in PDF Format
(58 KB)
PL-20-13-F.docx Report Public Open Document in PDF Format
(109 KB)
PL-20-13-Apps.pdf Appendix Public Open Document in PDF Format
(980 KB)

 

View History of Submission