Submission Documents: 2013/295/PPF: To erect and install 1 no. 5kw wind turbine on a 15m high mast, adjacent to Mangaster, Sullom, by Mr B Manson, Mangaster, Sullom, Shetland.
This is the list of documents available for the submission 2013/295/PPF: To erect and install 1 no. 5kw wind turbine on a 15m high mast, adjacent to Mangaster, Sullom, by Mr B Manson, Mangaster, Sullom, Shetland. .
Click on the links to view the individual documents in PDF format.
Name | Type of Document | Access | View Document |
Item Minute - 10 December 2013 | Minute | Public |
(58 KB) |
PL-20-13-F.docx | Report | Public |
(109 KB) |
PL-20-13-Apps.pdf | Appendix | Public |
(980 KB) |