Submission Documents: 2013/403/PPF: Erect a 6kw wind turbine on a 9m high tower and excavation of associated trench for electricity calbe, The Final Frontier, Noness, Sandwick, by Mr and Mrs Alan Smith. Help Icon

This is the list of documents available for the submission 2013/403/PPF: Erect a 6kw wind turbine on a 9m high tower and excavation of associated trench for electricity calbe, The Final Frontier, Noness, Sandwick, by Mr and Mrs Alan Smith..

Click on the links to view the individual documents in PDF format.

Name Type of Document Access View Document
Item Minute - 14 January 2014 Minute Public Open Document in PDF Format
(72 KB)
PL-01-14-F.docx Report Public Open Document in PDF Format
(123 KB)
PL-01-14-Appendix.pdf Appendix Public Open Document in PDF Format
(132 KB)

 

View History of Submission