Submission Documents: 2020/201/PPF - Creation of a 100m x 80m compacted stone platform and siting of concrete batching plant and associated facilities, to be partially surrounded by soil bunding, Hill of Flamister (approximately 3.2 km north-east of the Sandwater Loch section of the A970 and approximately 1.5 km north-west of the Loch of Skellister (NGR HU 44487 57040)) (Temporary period to expire on completion of construction of Viking Wind Farm). Help Icon

This is the list of documents available for the submission 2020/201/PPF - Creation of a 100m x 80m compacted stone platform and siting of concrete batching plant and associated facilities, to be partially surrounded by soil bunding, Hill of Flamister (approximately 3.2 km north-east of the Sandwater Loch section of the A970 and approximately 1.5 km north-west of the Loch of Skellister (NGR HU 44487 57040)) (Temporary period to expire on completion of construction of Viking Wind Farm)..

Click on the links to view the individual documents in PDF format.

Name Type of Document Access View Document
Item Minute - 20 September 2021 Minute Public Open Document in PDF Format
(409 KB)
PL-01-21-F.docx Report Public Open Document in PDF Format
(255 KB)
PL-01-21 Appendix 1.docx Appendix Public Open Document in PDF Format
(590 KB)
PL-01-21 Appendix 2.docx Appendix Public Open Document in PDF Format
(88 KB)
PL-01-21 Appendix 3.docx Appendix Public Open Document in PDF Format
(313 KB)
PL-01-21 Appendix 4.docx Appendix Public Open Document in PDF Format
(690 KB)

 

View History of Submission