Submission History: 2018/186/PPF: The construction and operation of Mossy Hill Wind Farm with a maximum generating capacity of up to 50MW, comprising 12 wind turbine generators (WTGs) with maximum tip heights of 145m with associated infrastructure, by Peel Wind Farms (No.1) Ltd.
This is the history for the submission "2018/186/PPF: The construction and operation of Mossy Hill Wind Farm with a maximum generating capacity of up to 50MW, comprising 12 wind turbine generators (WTGs) with maximum tip heights of 145m with associated infrastructure, by Peel Wind Farms (No.1) Ltd.".
It shows every meeting that the submission went before and links to the agenda for those meetings.
Committee | Meeting | View Agenda |
Planning Committee | 15/04/2019 | Click here |