Submission History: 2018/186/PPF: The construction and operation of Mossy Hill Wind Farm with a maximum generating capacity of up to 50MW, comprising 12 wind turbine generators (WTGs) with maximum tip heights of 145m with associated infrastructure, by Peel Wind Farms (No.1) Ltd. Help Icon

This is the history for the submission "2018/186/PPF: The construction and operation of Mossy Hill Wind Farm with a maximum generating capacity of up to 50MW, comprising 12 wind turbine generators (WTGs) with maximum tip heights of 145m with associated infrastructure, by Peel Wind Farms (No.1) Ltd.".

It shows every meeting that the submission went before and links to the agenda for those meetings.


Committee Meeting View Agenda
Planning Committee 15/04/2019 Click here