Submission Documents: 2018/335/ECUCON - To vary the consent by increasing the maximum tip height of the turbines from 145 metres (m) to a maximum of 155 m and increasing the maximum rotor diameter of the turbines by 10 m to a maximum of 120 m. The installed capacity of the proposed generating stated would be greater than 50 MW. (Viking Wind Farm).
This is the list of documents available for the submission 2018/335/ECUCON - To vary the consent by increasing the maximum tip height of the turbines from 145 metres (m) to a maximum of 155 m and increasing the maximum rotor diameter of the turbines by 10 m to a maximum of 120 m. The installed capacity of the proposed generating stated would be greater than 50 MW. (Viking Wind Farm). .
Click on the links to view the individual documents in PDF format.